Drag the vertical sliders to adjust attachment heights — Primary, Neutral, and Communication. Clearance brackets update live with GO-95 Table 1 or NESC 232 verdicts. Red = violation, green = compliant.
Code
Attachment heights
15 kV
Primary 38 ft
Primary 38 ft
Neutral 32 ft
Comm 24 ft
Pole height 45 ft
Verdicts
Clearance rules shown:
In GO-95 mode, the required vertical separation between primary and neutral is
40 in (3.3 ft) (Table 1 Case 11, supply to neutral on same structure).
Between neutral and communication is 40 in (3.3 ft)
(Table 1 Case 13, neutral to comm). Between primary and comm is
40 in minimum for GO-95 Grade C (Table 2 — same structure).
In NESC mode, Table 232-1 and 235-5 apply with grade-B defaults. The platform's
Clearance API
runs all 14 GO-95 Table 1 cases and full NESC 232/235 against a complete Universal Pole Model.